Skip to content

Plan first

With Plan first on (the switch next to the message box, or /plan), each new message first gets a plan to approve, before anything changes.

While it plans

"Writing a plan: this message's work only reads, and nothing changes before you approve it." A plan turn can only list, read and search files, look at images, ask you questions, read notes and recall memory, at any permission level.

When Who changes the files is Orchestrator delegates the work (Settings › This project › Agents), the plan is asked to say that the Orchestrator changes no files in the work turn, and to name the sub-agent or role that makes each change.

The plan card

Approve this plan?

  • Approve starts the work at once, following the plan.
  • Edit lets you change the plan, then Approve edited plan.
  • Reject, then Reject plan, with "Why not, in a sentence (optional)".

"Approve here — a new message plans again." If a later message started meanwhile, the card says "This plan was not decided": reject it, or ask again.

If the project is over its monthly budget, approving asks "Start the work anyway?" with Go on anyway and Cancel.

On the canvas

A plan turn shows a small Plan node, which says how the plan stands: "being written", "proposed" or "approved" (or "rejected"). In the work turn of an approved plan, a small Plan node stands over the Orchestrator, on a dashed line down to it; the legend calls it "From an approved plan down to the Orchestrator that carries it out". Click a Plan node to read the plan in the Inspector.

When there is no plan

Plan first applies to your own messages in a chat with a folder. A plain chat (no folder), a trigger's turn and a room never plan first.